After arriving from Jamaican quarantine at 2 am this morning, I was on site at 7 at this customer who had the machine delivered a couple of weeks ago. Once there, within minutes we had the silo stood up and in its correct and final position. Connecting all the submerged pump pipes etc together is […]
Category Archives: Case Studies
We often get difficult jobs with many fabricators in the stone industry having limited space, but yesterday was particularly challenging. A small space to begin with made more difficult by the addition of a crane adjacent since our machine was ordered. Thankfully the riggers were brilliant, positive and funny guys who wouldn’t give up and […]
Sometime in 2019, I met a Gentleman in Nashville Tennessee while touring some shops with our ClearCut measuring system, called Duan Coqui. We spent some time looking around his shop and talking about the industry. Our paths crossed a couple more times and in the beginning of 2020 we spent a few days together in […]
Spaulding Stone – MULTIDEP 800 QR2 Shortly after TISE in Las Vegas, January 2020, well …. literally right after … we installed a MultiDep 800 QR, Dual Silo machine at Spaulding Stone in Minnesota. We had visited the guys there almost a year before, shortly after TISE 2019, at which point they had in place […]
Emco Williams DEP 160/600 We recently installed a new 160 gpm/ 600 lpm system at Emco Williams fabrication facility in Sevierville, Tennessee. This customer was using all city water, with an astonishing water bill every month ! Not the easiest solution as they have 2 small satellite dirty water pits and the position for the […]